Deliverables

40 deliverables (public or confidential) will be produced in the course of this 4-year project. The public deliverables are available for download below.

WP1

NA1 - Sectorial Integration and Sustainability Strategy

D1.1

Identification of RI users and UDS community needs - Lead Partner: GRAIE (M15)

SEE DELIVERABLE

D1.2

Roadmap of RI required to support effective UDS transition at EU level - Lead Partner: GRAIE (M42)

SEE DELIVERABLE

WP2

NA2 - Harmonization and Capacity building

D2.1

Intermediate report on the proposed the data management system, incl. harmonization of Co-UDlabs sensors, technologies and data procedures - Lead Partner: EAWAG (M24)

SEE DELIVERABLE

D2.2

Final report on the proposed the data management system, incl. harmonization of Co-UDlabs sensors, technologies and data procedures - Lead Partner: EAWAG (M44)

SEE DELIVERABLE

D2.3

Intermediate report on staff development - Lead Partner: Euronovia (M24)

SEE DELIVERABLE

D2.5

Report on smart governance and public access to data - Lead Partner: EAWAG (M41)

SEE DELIVERABLE

WP3

NA3 - Training Activities

D3.1

1st report on training and education activities - Lead Partner: Euronovia (M17)

SEE DELIVERABLE

D3.2

2nd report on training and education activities - Lead Partner: Euronovia (M36)

SEE DELIVERABLE

D3.3

3rd report on training and education activities - Lead Partner: Euronovia (M44)

SEE DELIVERABLE

WP4

NA4 - Communication, dissemination and exploitation of results

D4.1

Data Management Plan - Lead Partner: Euronovia (M6)

SEE DELIVERABLE

D4.2

Plan for exploitation and dissemination of the project results - Lead Partner: Euronovia (M6)

SEE DELIVERABLE

D4.3

Mid-term report on dissemination and communication activities, including KPIs reports - Lead Partner: Euronovia (M24)

SEE DELIVERABLE

WP5

NA5 - Management of the TA

D5.1

Manual with the TA call rules and procedures and the description of the facilities – Lead Partner: UDC (M6)

SEE DELIVERABLE

D5.2

Report on evaluation procedure 1st call – Lead Partner: UDC (M18)

SEE DELIVERABLE

D5.3

Report on evaluation procedure 2nd call – Lead Partner: UDC (M33)

SEE DELIVERABLE

WP6

JRA 1 - Smart sensing and monitoring in urban drainage

D6.1

Report on review and selection of 6 new/emerging monitoring technologies to be tested in T6.1.2. – Lead partner: EAWAG (M12)

SEE DELIVERABLE

D6.3

User toolbox package for I) sensor calibration, II) data validation and III) uncertainty assessment - Lead partner: INSA LYON (M24)

SEE DELIVERABLE

D6.4

Report on space distributed monitoring and data interpretation - Lead partner: USFD (M41)

SEE DELIVERABLE

WP7

JRA 2 - Evaluation of assets deterioration in urban drainage systems

D7.1

Report on testing methodology identify inpipe defects – Lead partner: USFD (M18)

SEE DELIVERABLE

D7.2

Report on assessment of current pipe condition assessment and a proposed common EU approach, supporting data in open access repository – Lead partner: USFD (M24)

SEE DELIVERABLE

D7.3

Report on how to create common European inpipe defect scenarios – Lead partner: USFD (M24)

SEE DELIVERABLE

D7.4

Report on the development of mechanistic models able to simulate the temporal deterioration of drainage assets – Lead partner: IKT gGmbH (M36)

SEE DELIVERABLE

D7.5

Report on case studies from Task 7.3 2 – Lead partner: USFD (M44)

SEE DELIVERABLE

WP8

JRA 3 - Improving resilience and sustainability in urban drainage solutions

D8.1

Report on determined Scalable Hydrodynamic Performance Protocols of Task 8.1.1 – Lead partner: UDC (M24)

SEE DELIVERABLE

D8.2

Report on determined Scalable Measurement Protocols to Assess the Pollutant Retention and Release potentials of Urban Drainage Structures of Task 8.1.2. - Lead partner: IKT GmbH (M24)

SEE DELIVERABLE

D8.3

Report on the performance of Urban Drainage Systems under Pressure and their Recovery - Lead partner: USFD (M36)

SEE DELIVERABLE

D8.4

Report on hydrodynamic design for stormwater detention ponds optimized for cost-efficient maintenance - Lead partner: AAU (M30)

SEE DELIVERABLE

D8.5

Report on use of designer soils for Sustainable Urban Drainage Systems - Lead partner: INSA LYON (M44)

WP9

TA - Transnational Access Provision

D9.1

1st report on TA provision– Lead partner: UDC (M30)

SEE DELIVERABLE

WP10

Management and Coordination

D10.1

1st periodic report – Lead partner: UDC (M18)

SEE DELIVERABLE

D10.2

2nd periodic report – Lead partner: UDC (M36)

SEE DELIVERABLE

D10.3

Final report – Lead partner: UDC (M48)

D10.4

Project Management Handbook – Lead partner: UDC (M3)

SEE DELIVERABLE

WP11

Ethics requirements

D11.1

POPD - Requirement No. 1 – Lead partner: UDC (M4)

Confidential

D11.2

EPQ - Requirement No. 2 – Lead partner: UDC (M4)

Confidential